Instrumentation and control work on an international oil and gas project, delivered to the client's specification and documentation requirements.
The problem
Pump and skid equipment needed reliable measurement and clear interlocks, with documentation that matched the client's review process. Site access was limited, so anything that could be tested and proven before dispatch had to be.
What we did
The result
Because the panels and logic were proven before dispatch, the site work concentrated on installation and loop checks rather than rework. The client received a complete, reviewable documentation set at handover.


Send the specification and we'll tell you what we can take on.